+8613332500005      info@halcyonsteelhomes.com      Foshan, Guangdong, China
Factory Supply
Light Steel Housing
Export Support
Packing & Loading
Project Review
Drawings & Scope
Get A Quote

Project Quotation Process

From inquiry to material scope

How we review drawings and prepare a material quotation

A clear quotation starts with clear drawings and material scope. This page explains what we review, what we may ask you to confirm, and how a project-based material quote is prepared.

Quotation Workflow

1. Receive Project Information

  • Drawings or sketches
  • Building type and floor area
  • Project location
  • Required material scope

2. Review Scope

  • Steel framing requirements
  • Wall, floor and roof layers
  • Door, window and stair coordination
  • Export packing requirements

3. Clarify Open Items

  • Missing dimensions
  • Local engineer requirements
  • Material options
  • Destination port and schedule

4. Prepare Quotation

  • Material scope list
  • Production coordination note
  • Packing and loading approach
  • Next-step communication

5. Confirm Order Scope

  • Final drawings
  • Material selections
  • Quantity confirmation
  • Production file preparation

6. Production Support

  • Component labeling
  • Packaging preparation
  • Loading coordination
  • Document support

Best Files To Share

Drawing Files

PDF, DWG, Revit, SketchUp, images or hand sketches can be used for initial discussion. More accurate drawings help produce a clearer material scope.

Project Notes

Tell us the building use, number of floors, approximate area, location, target schedule and whether you need steel framing only or a broader material package.

Ready to Prepare a Scope?

Send the available project information first. We can review what is missing before moving into a formal material quotation.